NIPSCO Pole Replacement Program

Pierce Powerline supports NIPSCO’s Pole Replacement Program, part of the utility’s 2021–2026 Electric Plan to modernize aging infrastructure across northern Indiana.

Our transmission crews replace and upgrade high‑voltage infrastructure ranging from 138 kV to 765 kV, helping improve grid safety and long‑term reliability.


Project Scope Included:

 

Removing and installing transmission poles, crossarms, insulators, and hardware

Stringing, repairing, and upgrading high‑voltage conductors

Working on or near energized systems in accordance with NIPSCO Life Saving Rules

Operating bucket trucks, aerial lifts, and excavation equipment

Performing emergency repairs following storm damage or system failures

 

Crew Configurations:

 

Bucket Crews – Foreman‑led crews utilizing aerial bucket trucks for elevated work

Manual / Pole Crews – Focused on structural installation, replacement, and ground support

Category
Transmission
Tags
Indiana